Skip to content

Other

Cold-weather multi-domain experiment

Systems from several suppliers trialed together across land, sea, air and undersea in sub-zero conditions, their data fused into one picture, and validated for wider use.

Kind of event
Other
Format
In person
Team size
Solo or in teams
Who takes part
Invite only

For systems from several suppliers that must work together, and must work where conditions are hard. First everyone agrees a common baseline: the interfaces and data standards each system uses, what will be measured, and the safety case. Then the systems go to the field together for a trial window. Afterwards the data each system produced is fused into one picture, to show whether systems from different suppliers really work as one. Last, what held up is validated, and the decision on each system recorded: adopt, trial further, or stop. Modeled on defense experimentation in the High North: an innovation arena between design and fielding rather than a war game. Uncrewed systems and the people working with them are tested together, including launching and recovering from vessels at sea, with communications deliberately degraded. Unclassified: open, synthetic or declassified data only.

What it is for

  • Every system is measured against a baseline agreed before the trials.
  • Systems from different suppliers are shown to work as one, or the gap is named.
  • What the conditions did to each system, and to its operators, is recorded.
  • Every system leaves with a decision: adopt, trial further, or stop, and an owner.

Phases

  1. 1

    Agree the baseline

    Discovery Not judged
    • Starts with the event
    • Lasts 2 days
    • Hands in: Use case

    Two days together, weeks before the trials: every supplier states its system, the interfaces and data standards it will use, what it will be measured on, and how it will be kept safe. The baseline is set here, before anything goes to the field, so no result can move it.

    What an entry answers

    1. 1

      What is your system, and what part does it play alongside the others? Required

    2. 2

      Which interfaces and data standards will it use to share what it produces? Required

      Name the standard and the version. The fusion phase tests whether these really let the systems work as one.

    3. 3

      What will be measured in the field, and what result counts as success? Required

      Decide it now, before the trials, so the result cannot move it.

    4. 4

      Which conditions do you expect to limit it, and how will you know when they do? Required

    5. 5

      What could go wrong for the people operating it, and how is it controlled? Required

    6. 6

      What classification would the full system need? Required

      Everything on HackUpon is unclassified. Say what a full version would need, never put classified material here.

    7. 7

      Is any part of it export controlled? Required

    Agents that help

    Checks on every entry

    • Required fields
  2. 2

    Field trials

    Trial Not judged
    • Starts 14 days into the event
    • Lasts 18 days
    • Hands in: Project

    The trial window: every system runs its scenarios in the field, alongside the others and the people who would use it, and records what happened in every run and under which conditions. Expect sub-zero temperatures, icing, high winds and rough seas, reduced battery endurance, magnetic interference and sparse or deliberately degraded networks, and operators exposed to the same conditions as the systems.

    What an entry answers

    1. 1

      Which scenarios did you run, how often, and with whom? Required

    2. 2

      What were the conditions in each run, and what did they do to the system? Required

      Temperature, wind, sea state, icing, light, power and communications: whatever applied.

    3. 3

      What failed or degraded, and why? Required

      Including what failed for the people operating it. A failure recorded is a result.

    4. 4

      What data did the system produce, and where is it kept for the fusion phase? Required

    5. 5

      Did anyone operating it come to harm or a near miss? Required

      Say what happened in the answer above; the organizers follow up on every near miss.

    Agents that help

    Checks on every entry

    • Required fields
  3. 3

    Fuse the data

    Build Not judged
    • Starts 33 days into the event
    • Lasts 7 days
    • Hands in: Demo

    A week after the trials: the data every system produced is brought together to test whether systems from different suppliers form one picture, through the interfaces and standards agreed at the baseline, including when communications were degraded.

    What an entry answers

    1. 1

      Which systems’ data fused into one picture, and through which standard? Required

    2. 2

      What did not fuse, and what would it take? Required

    3. 3

      What still worked when communications were degraded or cut, and what caught up afterwards? Required

    Agents that help

    Checks on every entry

    • Required fields
  4. 4

    Validate

    Review Judged
    • Starts 41 days into the event
    • Lasts 14 days
    • Hands in: Project

    The results against the baseline, and a decision on each system: adopt, trial further, or stop, with what must change in how it is used. The end users and the capability owner decide with the organizers.

    What an entry answers

    1. 1

      What readiness has it shown? Required

    2. 2

      How did it do against the measures agreed at the baseline? Required

    3. 3

      What do you recommend? Required

    4. 4

      What must change in how it is used, maintained or stored before wider use? Required

    5. 5

      Who would own it in use?

    Rubric

    • Against the baseline weight 2

      Results measured as agreed before the trials.

    • Works with the others weight 1.5

      Its data fused with the other systems’ through the agreed standards.

    • Held up in the conditions weight 1.5

      What the environment did to it, honestly recorded.

    • Safe to operate weight 1

      The people operating it were protected, and near misses learned from.

    • Route to use weight 1

      An owner, and what must change before wider use.

    Checks on every entry

    • Required fields

Programs that use it