Pre-work
Discovery Not judged- Starts 7 days before the event
- Lasts 6 days
- Hands in: Use case
Pick a problem, find an engineer, agree the measure. Not judged.
What an entry answers
- 1
Which operational problem, on which part of the network? Required
- 2
Which engineer is working with you, and what does good look like? Required
- 3
Which open, synthetic or historical data will you use? Required
Checks on every entry
- Required fields