Skip to content

Build sprint

Validated pilot

Twelve weeks in one lab, study or site under change control, with validation and agreed measures, ending in adopt, extend or stop.

Kind of event
Build sprint
Format
In person
Team size
Teams of 2 or more
Who takes part
Invite only

A solution that won a hackathon or a challenge is piloted in one lab, study or manufacturing site for twelve weeks. Its intended use, the validation it needs, the change control and the measures are agreed before it starts, and the people responsible for each record stay responsible. The team reports the measures, any deviations and what the scientists said, and recommends adopt, extend or stop.

What it is for

  • The result is measured against the baseline agreed before it started.
  • Every pilot ends with a decision: adopt, extend or stop, and an owner.

Phases

  1. 1

    Pilot

    Build Judged
    • Starts with the event
    • Lasts 84 days
    • Hands in: Prototype

    Twelve weeks in one setting, then the measures against the agreed baseline.

    What an entry answers

    1. 1

      What is its intended use, and how was it validated for that? Required

    2. 2

      What did the pilot measure, against the baseline? Required

    3. 3

      Were there any deviations or data integrity findings, and what was done? Required

    4. 4

      What do you recommend? Required

    5. 5

      What data would the full solution need? Required

      Events use public or synthetic data. Say what a live version would need; never upload trial participants’ data or confidential structures.

    6. 6

      Does it touch regulated records or decisions? Required

      The closer it is to regulated records, the more validation and change control it needs before it is used.

    7. 7

      How would you show it does what it should, and what happens if it is wrong? Required

    Rubric

    • Against the baseline weight 2

      Measured as agreed before it started.

    • Validated and controlled weight 1.5

      Fit for its intended use; changes controlled.

    • Scientist experience weight 1

      The people using it would keep it.

    • Adoption plan weight 1

      An owner, a cost and the next labs or sites.

    Checks on every entry

    • Required fields

Programs that use it