Pilot
Build Judged- Starts with the event
- Lasts 56 days
- Hands in: Prototype
Eight weeks in one site, then the measures against the baseline.
What an entry answers
- 1
What was measured before, where, and over what period? Required
- 2
What did the pilot measure, against that baseline? Required
- 3
Were there any safety incidents or near misses, and what was done? Required
- 4
What do you recommend? Required
- 5
What data would the full solution need? Required
Events use open, synthetic or anonymized data. Say what a live version would need; never upload drivers’ or customers’ personal data.
- 6
What does it touch? Required
The closer it is to vehicles and equipment, the more safety review and testing it needs before it is used.
- 7
What happens to drivers, staff or goods if it is wrong, and how is that caught? Required
Rubric
- Against the baseline weight 2
Measured as agreed before it started.
- Safe in use weight 1.5
No harm to people; incidents reported and acted on.
- Driver and staff experience weight 1
The people using it would keep it.
- Adoption plan weight 1
An owner, a cost and the next sites.
Agents that help
Checks on every entry
- Required fields