Skip to content

Build sprint

Network trial

Twelve weeks in one region or cluster of sites, with a rollback plan and agreed measures, ending in adopt, extend or stop.

Kind of event
Build sprint
Format
In person
Team size
Teams of 2 or more
Who takes part
Invite only

A solution that won a hackathon or a challenge is trialled in one region, cluster of sites or group of customers for twelve weeks. The change process, the rollback, the security review and the measures are agreed before it starts, and network operations can switch it off at any time. The team reports the measures, any incidents and what engineers and customers said, and recommends adopt, extend or stop.

What it is for

  • The result is measured against the baseline agreed before it started.
  • Every trial ends with a decision: adopt, extend or stop, and an owner.

Phases

  1. 1

    Trial

    Build Judged
    • Starts with the event
    • Lasts 84 days
    • Hands in: Prototype

    Twelve weeks in one region or cluster, then the measures against the baseline.

    What an entry answers

    1. 1

      What was measured before, where, and over what period? Required

    2. 2

      What did the trial measure, against that baseline? Required

    3. 3

      Were there any incidents or rollbacks, and what was done? Required

    4. 4

      What do you recommend? Required

    5. 5

      What data would the full solution need? Required

      Events use a sandbox, synthetic or aggregated data. Say what a live version would need; never upload subscriber records.

    6. 6

      What does it touch? Required

      The closer it is to the live network, the more testing, security review and rollback it needs before it goes live.

    7. 7

      What happens to service if it is wrong, and how is it rolled back? Required

    Rubric

    • Against the baseline weight 2

      Measured as agreed before it started.

    • Safe in use weight 1.5

      No service lost; incidents rolled back and acted on.

    • Engineer and customer experience weight 1

      The people using it would keep it.

    • Adoption plan weight 1

      An owner, a cost and the next regions.

    Checks on every entry

    • Required fields

Programs that use it