Agree the baseline
Discovery Not judged- Starts with the event
- Lasts 2 days
- Hands in: Use case
Two days together, weeks before the trials: every supplier states its system, the interfaces and data standards it will use, what it will be measured on, and how it will be kept safe. The baseline is set here, before anything goes to the field, so no result can move it.
What an entry answers
- 1
What is your system, and what part does it play alongside the others? Required
- 2
Which interfaces and data standards will it use to share what it produces? Required
Name the standard and the version. The fusion phase tests whether these really let the systems work as one.
- 3
What will be measured in the field, and what result counts as success? Required
Decide it now, before the trials, so the result cannot move it.
- 4
Which conditions do you expect to limit it, and how will you know when they do? Required
- 5
What could go wrong for the people operating it, and how is it controlled? Required
- 6
Which spectrum and licenses does the trial need, and who holds them? Required
Agents that help
Checks on every entry
- Required fields