Skip to content

Hackathon

Industrial AI hackathon

A week of pre-work on the plant’s problems, then two days building on exported plant data.

Kind of event
Hackathon
Format
Hybrid
Team size
Teams of 2 or more
Who takes part
Application

Teams of data scientists, controls engineers and the people from the line pick a problem from the shop floor, agree the baseline in a week of pre-work, then build for two days on exported plant data. Judges weigh the impact on the line, safety and OT security, and whether the shift would use it. The best go to a line pilot.

What it is for

  • Every team measures its result against an agreed baseline.
  • Most participants end on a team that hands something in.
  • At least one solution is ready for a line pilot.

Phases

  1. 1

    Pre-work

    Discovery Not judged
    • Starts 7 days before the event
    • Lasts 6 days
    • Hands in: Use case

    Pick a problem, get the data, agree the baseline with the line. Not judged.

    What an entry answers

    1. 1

      Which problem, on which line? Required

    2. 2

      What is the baseline, measured how and over what period? Required

      Downtime minutes, scrap rate, changeover time or energy per part before the change.

    3. 3

      Which data will you use, and has it been exported and anonymized? Required

    Checks on every entry

    • Required fields
  2. 2

    Build

    Build Judged
    • Starts with the event
    • Lasts 2 days
    • Hands in: Demo

    Two days to build on the use case, then a five-minute demo to the judges.

    What an entry answers

    1. 1

      What does it do, and what did it show against the baseline? Required

    2. 2

      What would it cost to run on the line, and what would it save? Required

    3. 3

      What would it need from the plant’s systems? Required

      Anything that writes to a control system needs the plant’s OT security and safety sign-off.

    4. 4

      What could go wrong for the people on the line, and how is that prevented? Required

    Rubric

    • Impact on the line weight 2

      Downtime, scrap, changeover or energy, against a baseline.

    • Works with plant data weight 1.5

      Built on data the plant really has, at the quality it has.

    • Safe and secure weight 1.5

      Safe for people; nothing unvetted touches control systems.

    • Payback weight 1

      What it costs to run against what it saves, and how soon.

    • Adoptable by the shift weight 1

      The operators and maintainers can and would use it.

    Checks on every entry

    • Required fields
    • Artifact present
    • Demo matches the description
    • Repository reachable
    • Licenses in order

Programs that use it