Event templates
- Build sprint
Proof of concept on the shop floor
A production problem framed with the line, a proof run off-line or on a simulation, and the next step decided.
Phases: 3 Teams of 2 or more - Discovery workshop
Shop-floor problem hunt
Operators, maintainers and engineers write up the problems that cost the line most, each with its numbers.
Phases: 1 Teams of 2 or more - Hackathon
Industrial AI hackathon
A week of pre-work on the plant’s problems, then two days building on exported plant data.
Phases: 2 Teams of 2 or more - Build sprint
Line pilot
Six weeks on one real line, measured against the baseline, ending in roll out, extend or stop.
Phases: 1 Teams of 2 or more - Innovation challenge
Supplier innovation challenge
Suppliers and start-ups propose against published plant challenges; the best prove their value on site.
Phases: 2 Solo or in teams
Programs
Shop-floor problem to line pilot
Two and a half months from the shop floor’s costliest problems to a solution measured on a real line: find the problems with the people who run it, build on plant data, pilot the best.
-
Day 0 · 1 day
-
Day 21 · 2 days
-
Day 35 · 42 days
-
Supplier challenge to roll-out
Publish the plant’s challenges to suppliers and start-ups, prove the shortlist’s value, and pilot the winner on a line before it is rolled out.
-
Day 0 · 91 days
-
Day 105 · 42 days
-
Challenge briefs
- Sustainability Keep materials in use Match surplus materials, equipment or food with people who can use them before they become waste.
- The problem
- Surplus is listed nowhere and collected too late.
- What a good result achieves
- Fewer tonnes to landfill, measured, and a match people trust.
- Skills
- Product DesignMobile DevelopmentBusiness Strategy
- Manufacturing Stop the line from stopping Predict machine failures early enough to fix them in a planned stop.
- The problem
- Lines stop without warning when a machine fails, and maintenance works to a calendar rather than to the machine’s condition.
- What a good result achieves
- Fewer unplanned stops, with warnings a maintenance planner trusts.
- Skills
- Data scienceMachine learningReliability engineering
- Manufacturing Find the defect before the customer does Inspect parts on the line with cameras and catch the defects people miss.
- The problem
- Inspectors check a sample of parts by eye; defects escape to customers and are found as returns and complaints.
- What a good result achieves
- Fewer escaped defects, without rejecting good parts.
- Skills
- Computer visionMachine learningIndustrial engineering
- Manufacturing Near misses before accidents Spot unsafe situations on the shop floor and get them fixed before someone is hurt.
- The problem
- Near misses go unreported because reporting is slow, and those reported wait weeks for action.
- What a good result achieves
- More near misses reported, and closed faster.
- Skills
- Product designMobile developmentHealth and safety
- Manufacturing Cut changeover time Shorten the time a line stands still between one product and the next.
- The problem
- Every product change stops the line while settings, tools and materials are swapped. The steps vary by shift, nobody sees the whole sequence, and the minutes add up to days a year.
- What a good result achieves
- Shorter, more consistent changeovers, with the steps that cause the delay shown to the team.
- Skills
- Industrial engineeringData analysisComputer vision
- Manufacturing Find why the scrap happens Trace scrap and rework to the process conditions that cause it.
- The problem
- Scrap is counted at the end of the line, but its causes are upstream — a temperature, a material batch, a tool’s wear. Engineers spend days correlating records by hand after the fact.
- What a good result achieves
- The likely causes of a scrap rise identified in hours, with the evidence an engineer can check.
- Skills
- Data scienceProcess engineeringStatistics
- Manufacturing Energy per part, not per month Measure and cut the energy each part takes, not just the plant’s monthly bill.
- The problem
- Energy is billed monthly for the whole site, so nobody knows which line, shift or product uses most, and savings cannot be proved.
- What a good result achieves
- Energy per part by line and product, and changes that cut it without slowing output.
- Skills
- Energy engineeringData analysisIoT
Innovation areas
-
Predictive maintenance
Machines that warn before they stop, and parts ordered before they are needed.
Measured by
- Unplanned downtime hours
- Mean time between failures
Problem set
- Stop the line from stopping
- Cut changeover time
-
Quality and inspection
Defects found on the line, not by the customer.
Measured by
- Escaped defects per million
- Inspection time per part
Problem set
- Find the defect before the customer does
- Find why the scrap happens
-
Energy and materials
Less energy per part, less scrap, and materials kept in use.
Measured by
- kWh per unit
- Scrap rate
Problem set
- Energy per part, not per month
- Find the energy a building wastes
- Keep materials in use
-
Supply chain resilience
Fewer stock-outs and shortages when suppliers or routes fail.
Measured by
- Stock-outs a month
- Days of cover for critical parts
Problem set
- Fewer empty shelves, less waste
- The last mile, cheaper and cleaner
-
Worker safety
Near misses spotted and acted on before they become accidents.
Measured by
- Recordable incidents
- Near misses reported and closed
Problem set
- Near misses before accidents
Use it in HackUpon
Sign in, copy it into your organization’s library and change anything: phases, questions, rubric.
Sign in