Skip to content

Innovation challenge

Supplier innovation challenge

Suppliers and start-ups propose against published plant challenges; the best prove their value on site.

Kind of event
Innovation challenge
Format
Distributed
Team size
Solo or in teams
Who takes part
Application

The plant publishes its challenges — the costliest problems from the shop floor, with the data it can share. Suppliers and start-ups propose, with a price and a payback. The shortlist proves its value in eight weeks on site or on exported data. Every proposal goes into the pipeline, so what is not chosen now stays on file.

What it is for

  • Enough credible proposals to choose a shortlist from.
  • The shortlist proves its value on the plant’s own problem.

Phases

  1. 1

    Proposals

    Discovery Judged
    • Starts with the event
    • Lasts 28 days
    • Hands in: Use case

    Four weeks to propose against a published challenge. Judged: the shortlist.

    What an entry answers

    1. 1

      What do you propose, and where has it worked before? Required

    2. 2

      What would a proof of value and a roll-out cost? Required

    3. 3

      What payback do you expect, and on what assumptions? Required

    4. 4

      What would it need from the plant’s systems? Required

      Anything that writes to a control system needs the plant’s OT security and safety sign-off.

    5. 5

      What could go wrong for the people on the line, and how is that prevented? Required

    Rubric

    • Impact on the line weight 2

      Downtime, scrap, changeover or energy, against a baseline.

    • Works with plant data weight 1.5

      Built on data the plant really has, at the quality it has.

    • Safe and secure weight 1.5

      Safe for people; nothing unvetted touches control systems.

    • Payback weight 1

      What it costs to run against what it saves, and how soon.

    • Adoptable by the shift weight 1

      The operators and maintainers can and would use it.

    Checks on every entry

    • Required fields
  2. 2

    Proof of value

    Build Judged
    • Starts 35 days into the event
    • Lasts 56 days
    • Hands in: Prototype

    Eight weeks for the shortlist to show its value on the plant’s problem.

    What an entry answers

    1. 1

      What is the baseline, measured how and over what period? Required

      Downtime minutes, scrap rate, changeover time or energy per part before the change.

    2. 2

      What did you show, against that baseline? Required

    3. 3

      What would it take to run on every line? Required

    4. 4

      What would it need from the plant’s systems? Required

      Anything that writes to a control system needs the plant’s OT security and safety sign-off.

    5. 5

      What could go wrong for the people on the line, and how is that prevented? Required

    Rubric

    • Impact on the line weight 2

      Downtime, scrap, changeover or energy, against a baseline.

    • Works with plant data weight 1.5

      Built on data the plant really has, at the quality it has.

    • Safe and secure weight 1.5

      Safe for people; nothing unvetted touches control systems.

    • Payback weight 1

      What it costs to run against what it saves, and how soon.

    • Adoptable by the shift weight 1

      The operators and maintainers can and would use it.

    Checks on every entry

    • Required fields

Programs that use it