Pilot on the line
Build Judged- Starts with the event
- Lasts 42 days
- Hands in: Prototype
Six weeks on one line, then the result against the baseline.
What an entry answers
- 1
What is the baseline, measured how and over what period? Required
Downtime minutes, scrap rate, changeover time or energy per part before the change.
- 2
What did the pilot measure, against the same baseline? Required
- 3
What did the operators and maintainers say? Required
- 4
What do you recommend? Required
- 5
Who in the plant would own it, and who supports it? Required
- 6
What would it need from the plant’s systems? Required
Anything that writes to a control system needs the plant’s OT security and safety sign-off.
- 7
What could go wrong for the people on the line, and how is that prevented? Required
Rubric
- Against the baseline weight 2
Measured as agreed before the pilot.
- Safe and secure weight 1.5
No incidents; OT security signed off.
- Shift adoption weight 1
The people on the line use it unprompted.
- Roll-out plan weight 1
An owner, a cost and the next lines.
Agents that help
Checks on every entry
- Required fields